From Factory Floor to Foundation

We are exploring prefabrication logistics and on-site assembly of CLT house kits, following the journey from digital model to labeled pallets, highway miles, crane hooks, and finally a tight, weather-ready shell. Expect practical steps, small field-tested tricks, and human stories that help a high-performance timber kit arrive complete, dry, and ready to lock together with satisfying precision on the very first day.

Designing the Flow Before Wheels Turn

Model-First Coordination

Leverage a construction-ready model that includes panel IDs, connection hardware, sealant types, and marked lifting anchors. Export concise assembly drawings for each sequence, with QR codes linking to the latest revisions. Encourage fabricator and site supervisors to run a virtual dry run. Every conflict removed digitally eliminates expensive improvisation when the crane clock is ticking and weather is shifting.

Numbering and Kitting That Match the Crane Rhythm

Bundle panels and hardware according to lift sequence, not just by room or floor. Group fasteners, tapes, membranes, and steel brackets into unmistakable kits tagged to panel IDs. Color-code corners, edges, and faces to prevent rotation errors. The goal is clear: zero rummaging on the deck, minimal handling, and maximum flow, so installers move from lift to connection with instinctive certainty.

Risk Mapping and Realistic Buffers

List risks by likelihood and impact: weather delays, route restrictions, crane downtime, or missing hardware. Attach mitigations to each risk, such as protected staging, alternative routes, backup rigging, and spare connectors. Allocate buffer time at interfaces between trades, not only at the project end. It is easier to accelerate a protected schedule than to rescue a brittle one under pressure.

Packaging That Protects and Accelerates

Transport, Access, and Just-in-Time Arrival

The shortest path is rarely the fastest when moving oversize timber. Confirm bridge clearances, turning radii, and staged delivery windows that match the crane’s appetite. Create a rolling warehouse mindset: the highway is storage, the curb is staging, the crane is fulfillment. Less time on the ground means cleaner panels, safer workflows, and fewer surprises when weather changes abruptly.

The First Lift: Establishing Reference and Rhythm

The initial set decides the whole dance. Confirm your reference lines, shims, anchors, and hold-downs before the first rigging call. A disciplined start aligns tolerances, confirms communication channels, and sets a realistic cadence. The quickest assemblies feel unhurried because sequencing, radio protocol, and hand signals were rehearsed before steel meets wood and gravity joins the conversation.

Connections, Weather Strategy, and Envelope Integrity

Fasteners, Plates, and Sequencing Tricks

Pre-stage the right bit types, drivers, and torque-limiting tools, and label boxes by panel ID rather than just length. Use temporary alignment screws or clamps that come out cleanly. Hidden plates look elegant but demand precise positioning; template jigs save headaches. The less you swap tools and hunt for hardware, the more every connection feels like a practiced click.

Air, Water, and Vapor Control That Lasts

Tape and membrane systems only work when edges are clean, dry, and tensioned correctly. Assign a dedicated installer to chase every seam right after fastening. Roll tapes firmly and protect corners from uplift during windy lifts. Keep a moisture meter handy. A few extra minutes spent sealing today prevents weeks of troubleshooting elusive drafts or moisture stains later.

Weather Windows and Temporary Protection

Treat the forecast like a trade partner. If rain is likely, shift to tasks under cover, or prioritize roof panels and temporary drains. Use sacrificial slipsheets at high-traffic edges, and tent vulnerable joints when gusts rise. Post-rain, wipe standing water, verify readings, and resume only when surfaces are ready. Patience with drying protects beauty and structural reliability alike.

Field QA That Builds Trust

Use simple, repeatable checks: panel ID match, hardware count, torque verification, tape roll pressure, and photo logs. Post a visible board where the day’s targets and verifications live. Invite installers to flag issues early without blame. When crews believe concerns will be heard and fixed, quality stops being a document and becomes a habit expressed in every motion.

Safety Woven into Speed

Protect leading edges, maintain fall restraints that do not tangle movement, and keep radios charged. Stage materials so no one lifts awkwardly or pivots with weight. A safe site is predictably fast because nobody hesitates near hazards. When everyone trusts the plan, even complex lifts feel like ordinary tasks, and productivity flows from quiet confidence rather than lucky breaks.

Learning Loops and Team Ownership

Close each day with a ten-minute stand-down: what worked, what dragged, and what surprised us. Capture tiny improvements, like a better tag color or revised tape order. Share wins with fabricators so packaging evolves too. Ownership grows when ideas from the deck become tomorrow’s standard, and the next project starts faster because this one taught generously.

Handover, Aftercare, and Future Projects

Documentation That Feels Useful

Bundle concise manuals with annotated photos taken during assembly, showing hidden plates, service chases, and anchor points. Provide a digital index so future trades can find exact details without guessing. When documents answer real questions quickly, clients value them, and future interventions remain respectful to the timber’s integrity and the original craftsmanship embedded in every joint.

Monitoring and Gentle Maintenance

Bundle concise manuals with annotated photos taken during assembly, showing hidden plates, service chases, and anchor points. Provide a digital index so future trades can find exact details without guessing. When documents answer real questions quickly, clients value them, and future interventions remain respectful to the timber’s integrity and the original craftsmanship embedded in every joint.

Stay Connected and Keep the Conversation Alive

Bundle concise manuals with annotated photos taken during assembly, showing hidden plates, service chases, and anchor points. Provide a digital index so future trades can find exact details without guessing. When documents answer real questions quickly, clients value them, and future interventions remain respectful to the timber’s integrity and the original craftsmanship embedded in every joint.

Lilyakom
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.